# Switchboard requirements for 3 phase charger

**URL:** <https://community.evnex.com/t/switchboard-requirements-for-3-phase-charger/348>\
**Category:** E7 & X Series Charge Points\
**Created:** [2 September 2024 21:52 UTC](https://community.evnex.com/t/switchboard-requirements-for-3-phase-charger/348 "2024-09-02T21:52:09Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![uptime](https://yyz2.discourse-cdn.com/flex030/user_avatar/community.evnex.com/uptime/32/251_2.png) [@uptime](https://community.evnex.com/u/uptime)\
**Post date:** [2 September 2024 21:52 UTC](https://community.evnex.com/t/switchboard-requirements-for-3-phase-charger/348/1 "2024-09-02T21:52:09Z")

</div>

Hi,  
I’m in the process of redesigning my switchboard as it’s an overflowing mess due to additions of heatpumps, submains, and a 3 phase solar system. Future planning will include an Evnex 3 phase charger install. How many slots on the board should I allow for? And should I make space for CT clamps etc?  
Thanks,  
Paul.

---

<div class="post-metadata">

**Author:** ![uptime](https://yyz2.discourse-cdn.com/flex030/user_avatar/community.evnex.com/uptime/32/251_2.png) [@uptime](https://community.evnex.com/u/uptime)\
**Post date:** [4 September 2024 09:05 UTC](https://community.evnex.com/t/switchboard-requirements-for-3-phase-charger/348/2 "2024-09-04T09:05:02Z")

</div>

All good. Should have RTFM before posting. Found the answer in the docs.
