Vary Amperage of charger

Hey ,

Just had an E2 flex installed on a single phase 32A circuit and working well. However I have two concerns here.

  1. The electrician that installed my unit is a mate, so no problem there however I have an issue that he has access to my charger via the installer app. I realize that this is for support purposes however if I didn’t know him I really don’t like the idea of a third party who I don’t know and might only use once having access . (Yes I know Evnex has some access but that’s LESS of an issue and the price of a connected charger).
  2. Why does the installing electrician have the ability to change the charge amps but the user doesn’t. I would like to change Amperage down to allow a slower charge at times and then ramp it up when I do need a faster charge. Again I understand that you don’t want end users changing it up to a higher level than the circuit allows however surely you could set a MAX Amperage and let the end user take it down or up to the Max.

Thoughts/Comments?

Hi there.

  1. The installer app only has access over Bluetooth, so the installer has to actually be present on site and close to the charger, which hopefully mitigates your concern? It’s not a cloud connection like the driver app (or even a WiFi one).
  2. The installer can set the maximum allowed charge rate which is the safety limit, but our intention is that the charger itself should then be able to handle any operational reasons why the charge rate needs to be reduced below that (i.e. without any effort being required on the part of the driver). Are you able to share what it is you’re hoping to achieve by varying the rate, so that we can see if there’s a way to make it work for you?

Kind regards,

Tom

  1. Hokay, I can live with that. Again in my case it’s a mate so but again,in a normal case having an electrician you don’t know having access to my charger even if they do have to be onsite for Bluetooth is still a “risk” in my mind. (Is it relevant that I work in IT and have spent a lot of time doing cyber security so might have my foil hat on too tight?!? :slight_smile: )
  2. I guess I’m old fashioned and prefer a longer cand slower charge rather than quicker as regardless of type or what the battery makes say I’d rather standardize on lower charge rate for less stress on a battery (yes I come from lead acid, NiCad days…) regardless of what the manufactuer says.I have a 32A line which appears to charge my normal depletion rate recharge in around 4 hours . I’d be more than happy to convert this to 16A to allow a slower charge as standard as my low cost period with my energy provider allows for this easily. Then if I need to charge quicker, or if we end up with multiple EVs in the house (which I suspect is coming), I could ramp it up as required. After spending the $$$s I believe I should have full control of MY asset as long as it’s safe (which it would be if there’s a max set and I could up or down it UP TO the Max setting.

Hope this helps.

For the size of battery in a car, 7kW charging is still very slow (0.12C).

In you case I would be more concerned that by charging slowly you will use noticeably more energy overall, because the car itself takes ~200-250W simply to be awake during charging. So the longer it takes, the more is wasted.

This article covers it a bit more: Slow-Charging Your EV Wastes More Power Than You'd Think - SolarQuotes Blog

Tom

1 Like

Tom’s overhead point is worth quantifying: at 16 A single-phase (~3.7 kW), 200–250 W is roughly 5–7% extra energy, not huge but real. If your cheap window is long enough, 16 A may still be fine; if not, scheduled 32 A charging for the shorter window will waste less. A practical compromise is to have the installer set the max to 16 A only if you actually want gentler charging, and use the schedule to fit the low-cost period rather than switching rates manually.